Estimates only. Real results change with the Bitcoin price, mining difficulty and network hashrate, transaction fees, and platform costs and fees. This is not financial advice and is not a promise of any return. The numbers can be negative.

Lower is better. Typical modern machines are roughly 15 to 25 W/TH.

Your electricity price, or a platform's per kWh equivalent.

Applied to the maintenance cost.

Example price. Type to override.

Used for payback time and for reinvesting. Other currencies appear when live prices load.

Estimate

BTC mined per day0.00004644 BTC
Revenue per day$3.25
Electricity per day$2.40
Service fee per day$0.00
Discount per day$0.00
Maintenance per day$2.40
Net per day$0.85
Net per month (30 days)$25.52
Net per year$310.54
Break-even BTC price$51,680
Maintenance as share of revenue74%

What if the price or the network changes? (net per month)

Net per month by BTC price change and network hashrate change
BTC price \ Network0%+10%+25%
-30%-$3.73-$9.94-$17.39
-15%$10.90$3.36-$5.68
0%$25.52$16.66$6.02
+15%$40.15$29.96$17.72
+30%$54.78$43.26$29.42

Growth over time

Projections from today, using the inputs above and the assumptions below. Mining difficulty usually rises and the price can move either way, so the assumptions are yours to change.

1 to 60.

Assumption. 0 means no growth; real networks usually grow.

Assumption. Negative for falls.

Cumulative net result (USD)
Estimated cumulative net result over 12 months at the entered price, and 30% lower and higher. At the entered price it ends at $306.29.-$200$0.00$200$400$600024681012

Months from today

  • Price 30% higher$657
  • Price as entered$306
  • Price 30% lower-$44.80

BTC mined in 12 months at the entered price: 0.016718 BTC before maintenance.

Enter the miner purchase cost above to see payback time.